I have a netwrok whihch has 5 loads at different buses and i have a time series(hourly) data that needs to be run at all these buses at specific times from 2021 to 2023. I am unable to connect these 5 loads at their respective buses and run a power flow. Please help me figure this out. Thank you.
I tried creating 5 different dataframes for the loads but unable to figure out the powerflow calculation.