How to unschedule a job or kill scheduler When you have scheduled a job using START STEP of a job In Pentaho DI?

49 Views Asked by At

I have scheduled a job to run daily using START STEP of a job and Not using the Schedule Prespective, Now i can't locate it in scheduled jobs, but the job runs daily for a specific date and i want to kill the scheduler and stop this Job.How to do do so ?

I tried checking scheduled jobs in Schedule prespective, Checked logs to locate the scheduled jobs But failed

1

There are 1 best solutions below

1
On

I think a similar question was asked in Job scheduled in Spoon (PDI) doesn't stop running in Pentaho Server (CE)

You can use cron-tab or windows scheduler – Helping Hand..Jan 8, 2021 at 10:57