Can you shelve code in TFS visual studio, roll back to a previous check in and the shelved code still be there?

112 Views Asked by At

Developers have redesigned the homepage for a website and I amended my automated tests to reflect this and checked in these changes. The homepage was reverted back to its original layout since the golive date has been pushed back three weeks. I have loaded the automated tests checked in before redesigned homepage changes. Between now and the new go-live date there will be new functionality added to other pages on the website. Am I able to

  1. Shelve the new code that tests new functionality
  2. When the new homepage is switched on, roll back to the last check in ( the one that had the tests that reflect the new homepage)
  3. Unshelve the new code and integrate it with tests for the new homepage
0

There are 0 best solutions below