How to analyze jmeter TPS graph

131 Views Asked by At

I made a TPS graph using jmeter, but I can't interpret what it means. Please tell me how to interpret the graph

request of type get named "A"

threads: 1000
ramp-up period: 100
loop Count: 1
  1. Active Threads Over Time

1. image

  1. Response Times Over Time

2. image

  1. Transactions per Second

3. image

1

There are 1 best solutions below

0
Dmitri T On

Your graphs mean that:

  1. You run 1 thread (virtual user)
  2. You can reach 10 transactions per second with this 1 thread
  3. Average response time is around 100 milliseconds

You might also be interested in: